Hi,
In my project a report was scheduled to run for every 10 min, But my requirement is to run that report from a workflow soon after the approver approve's the leave. Is it possible to run the report from FM or through class method?
Hi,
In my project a report was scheduled to run for every 10 min, But my requirement is to run that report from a workflow soon after the approver approve's the leave. Is it possible to run the report from FM or through class method?